Assessment and mitigation of Akagera river avulsion

The Rusumo Falls Hydroelectric Project (RFHP) is currently under construction. Upstream of the project site, shortly before the former confluence of the Nyabarongo and Akagera rivers, an avulsion has occurred and the Nyabarongo river is now flowing directly into Lake … Read More

Proposed Landslide Risk Management Project – Preparing the Investment Feasibility Study

Support of ICEM in development and preparation of proposed investment project for landslide risk management in line with ADB and government requirements, including of all necessary studies. The project will reduce the risk of landslide events. Interventions are both structural … Read More

Development of recommendations for integrated watershed development and management plans in 4 provinces of Cambodia

Monitoring of weather patterns in Cambodia has, over the last decades, shown an increasing impact of climate change, leading to reducing water resources and respective impacts for the local population. Based on the conditions well described in the ToR, HYDROC … Read More

Developing Capacity for Climate Resilient Road Transport Infrastructure

Rwanda’s road vulnerability to climate-change has increased steadily in the last decades. This includes vulnerability to land erosion and landslides as well as flooding, resulting in road damage and service interruptions. The Rwanda Transport Development Agency (RTDA) is the main … Read More

Water Resources System Integrator (WRSI) Consultancy Services

The BWCSRP is being executed with financial support of the World Bank with the main objective to strengthen the capacity of the Govt. of Bangladesh to deliver effective weather, water and climate information services to sector agencies and communities. The … Read More

Water Resources Project Preparatory Facility (WRPPF)

ADB and the Government of Nepal are supporting the Water Resources Project Preparatory Facility (WRPPF) to identify and prepare high-priority water resources management projects for potential funding by the Government with assistance from the ADB and/or other development partners. WRPPF … Read More

Vietnam Scaling up Urban Upgrading Project (SUUP)

The project will strengthen integrated, risk-informed planning capacity of the seven project cities which are in the early stages of urbanization (Bac Lieu, Ben Tre, Long Xuyen, Soc Trang, Tan An, Vi Thanh and Vinh Long) to incorporate green infrastructure … Read More

Nile Basin wetlands of transboundary significance: Inventory, Baseline Study and Framework Management Plan with a nested case study on the Sudd

The Nile and its main tributaries flow through several large wetlands of great relevance for biodiversity conservation and ecosystem services. The aim of the project is to strengthen the capacity of the NBI and the riparian states for the management … Read More

Supervision and Advice on Sediment Transport Modelling for the Chorokhi River, Georgia

The project aims at supporting Struijk, the main contract holder, with advice, support and modelling checks during the assessment of sediment transport capacity and sediment load in the Chorokhi River. Actual services provided by our staff within the assignment: Support … Read More

Physiographic Survey of Nzoia Watershed

The physiographic study is purposed to spatially and physically characterise the Nzoia watershed along several land characteristics including land cover, land use, soil characterisation, slope characterisation, land cover changes, agro-climatic zones, catchment degradation, morphology, geology, and water quality with the … Read More

Governing For Growth (G4G)

The USAID-funded Governing for Growth (G4G) in Georgia aims at supporting the Georgian Government with initiation and implementation of fundamental changes in Georgia’s water resource management. The project will support the Government of Georgia (GoG) activities at the national and … Read More

Technical Evaluation of Water Resilience and Disaster Early Warning Communication Measures in Marshall Islands

Targeted and evidence-based evaluation in partnership with existing national, regional, and community stakeholders and systems to strengthen and support the existing drought response coordination mechanism led by the RMI Government (i.e. the Emergency Operation Centre / NDMO and the WASH … Read More

Review and Evaluation of Water Sector Programmes

The EU Delegation to Egypt is supporting the Government of Egypt in continuing the reform programme of the water sector, in accordance with the objectives of the National Water Resource Plan (NWRP) 2005-2017, and of the Water and Wastewater Sector … Read More

Integrating Climate Risks into Water and Flood Management by Vulnerable Mountain Communities in the Greater Caucasus Region – Phase 3

The project aims to reduce vulnerability of the mountain communities of the Greater Caucasus region of Azerbaijan to climate change induced water stress and flood hazards by improved water and flood management through addressing the management framework at the legislative … Read More

Preparation of NBI Guidance Document on Environmental Flows

The objective of this assignment is to develop a structured and scientifically based Nile Basin Initiative (NBI) procedure for establishing environmental flows requirements for transboundary water resources planning purposes in the Nile Basin. Actual services provided by our staff within … Read More

Macro level study on the integrated development potential of sand-river wadis

Macro level study on the integrated development potential of sand-river wadis of Somaliland and Puntland. The study aims to define the hydrological principles that should be followed for improved planning, operation, maintenance and management of water resources in Somaliland and … Read More

Detailed Design and Construction Supervision for Hydrological Stations and an Integrated Water Resources Management Information System (IWRMIS)

The existing hydrological measuring station network in Zambia has deteriorated since the early 90s. Poor quality of available hydrological data makes water management and data utilisation difficult. The objective of the project was the establishment of an Integrated Water Resources … Read More

ORASECOM IWRM Plan, Transboundary Water management in SADC

The Orange-Senqu River Basin Commission (ORASECOM) has started work on the consolidation of a basin-wide Integrated Water Resources Management (IWRM) plan through Phase 3 of a GIZ support programme. The plan provides a framework for management, development and conservation of … Read More

Responding to Climate Change in Mozambique, Phase III – Cahora Bassa Hydropower Scheduling

Water resources of the Zambezi River are being increasingly utilised, resulting in the necessity to assess how to best utilise the water resources considering competing stakeholder needs. The objective of the project is to assess the ability of Cahora Bassa … Read More

Climate Change Adaptation and Impact Assessment Study for Munda Dam

Munda Dam is a multipurpose project catering for hydropower, irrigation water and flood protection purposes. The objective of the study is to assess the feasibility for constructing a hydropower dam in Munda, Pakistan. Works focus on climate change adaptation and … Read More

1 2